Skip to main content
Inspection outcome
Opened: November 26, 2025 · Status: Open
Citations issued

OSHA issued one or more Other-than-serious citations.

Safety inspection · Complaint · Partial — limited to specific operations or areas

Violations1
Serious+0
Initial penalty$2,475
Current penalty$2,475
Accidents0
Duration
Summary

What happened in this inspection

On November 26, 2025, OSHA opened Critical Path Reconstruction Inc.’s inspection #348617549 at MODESTO, California — an establishment in the roofing contractors industry. The case remains open or the close date has not yet been published.

OSHA cited the employer for 1 violation totaling $2,475 in current penalties. All citations were Other-than-serious.

Breakdown by classification
1violation total
Serious1100%

A Serious violation is one where there is substantial probability that death or serious physical harm could result, and the employer knew (or should have known) of the hazard. Maximum penalty is ~$16,550 per violation. The majority of OSHA citations fall into this category.

Citations

Citations issued in this inspection

1citations issued
$2,475current penalty
Look up on OSHA.gov
Seriousgravity 10
Citation #01001
1731(C)(1)General Duty Clause or unstructured citation
Initial$2,475
Current$2,475

Standard codes link to the regulation text on OSHA.gov. The text describes the rule itself; the specific findings of this inspection appear above. To see OSHA’s official record of this inspection, search activity number 348617549 at OSHA Establishment Search.

Reference

About OSHA inspections

The U.S. Occupational Safety and Health Administration (OSHA) conducts inspections under several triggers: programmed targeting of high-hazard industries, employee complaints, workplace accidents, fatalities, and follow-ups to prior citations.

📋
Citations

Each citation specifies a section of 29 CFR, a severity tier, and a proposed penalty. Employers can contest citations through OSHA’s informal conference or before the OSH Review Commission.

Open vs closed

An open case has not yet been administratively closed — citations may follow or the case may close without action.

💰
Current vs initial penalty

Initial penalty is the proposed amount at citation. Current penalty is the post-conference / settlement figure on file today.

🔗
Trigger types

A = Accident, B = Complaint, H = Programmed, F = Follow-up. See the glossary for all codes.

About this inspection

OSHA classified this as Complaint — an inspection triggered by a worker complaint.

Sources

Cross-check with OSHA directly

This page draws from the OSHA Integrated Management Information System (IMIS) via the DOL Open Data Portal. For the authoritative record, look up activity number 348617549 directly: