Wa317936314 - Critical Path Construction Inc
SEATTLE, Washington · All Other Specialty Trade Contractors (NAICS 238990) · ~4 employees on site
Safety record at a glance
Wa317936314 - Critical Path Construction Inc is a Washington-based employer with 1 OSHA inspection on file (covering 2015). Across those inspections, OSHA cited 0 violations.
Inspection & violation trend
Year-by-year activity, citations issued, and reported workplace incidents.
Hover any year for detail. Counts reflect inspections, citations, and accidents on file at OSHA — final dispositions and amounts may change after appeals or settlement.
Research Wa317936314 - Critical Path Construction Inc
All OSHA inspections at Wa317936314 - Critical Path Construction Inc
All 1 inspection closed without violations.
Similar employers in All Other Specialty Trade Contractors
Other employers with comparable industry classification or location.
How to read this record
An OSHA inspection record describes federal enforcement activity — it does not capture every workplace safety event at a company. A few caveats:
OSHA Violations Tracker indexes inspections opened on or after 2021-01-01. Older history is at OSHA’s establishment search.
OSHA records are keyed by physical establishment, not parent company. A large employer may operate many sites across states.
Many inspections close with no violations — that’s a positive signal, not a missing data row.
Final amounts may differ after informal conferences or settlement. We show what OSHA has on file today.
Full methodology, scoring details, and known limitations: /methodology.
Frequently asked questions about Wa317936314 - Critical Path Construction Inc
Wa317936314 - Critical Path Construction Inc earned a A safety grade (100/100) — strong record. The grade reflects severity of past citations, accident history, and how recent the most-recent inspection is. See the methodology for the full scoring algorithm.
Cross-check with OSHA directly
All data on this page comes from the U.S. Department of Labor Open Data Portal, which publishes the OSHA Integrated Management Information System (IMIS). For the authoritative record, search OSHA directly:
Make sense of OSHA enforcement
Guides, analysis, and worker-side explainers from our editorial team.
Industries With the Most OSHA Violations on Record (2026)
NAICS industries ranked by total OSHA citations and total inspections in the current enforcement window. Construction and specialty trades dominate both leaderboards.
The 15 U.S. Cities With the Most OSHA Inspections (2026)
A city-by-city ranking of U.S. metros with the highest OSHA inspection counts in the current enforcement window — what the city-level data reveals about regional safety enforcement.
OSHA Enforcement in 2026, By the Numbers: 426,000 Employers on Record
An overview of OSHA enforcement activity across 426,760 U.S. employers — 575,985 inspections, 24,000 violations, and $62,581,468 in penalties currently on file.
Seattle vs. Portland: OSHA Enforcement in Two Pacific Northwest Cities Compared
A side-by-side comparison of OSHA enforcement activity in Seattle and Portland — inspection counts, violations, penalties, and what the data reveals about workplace safety in each city.
The 10 U.S. Employers With the Largest OSHA Penalties on Record (2026)
A ranked list of the ten U.S. employers carrying the highest cumulative OSHA penalty assessments in the current enforcement window, with links to their full inspection histories.
The 10 Most-Inspected U.S. Employers in OSHA Records (2026)
Ten U.S. employers with the highest OSHA inspection counts across the current five-year enforcement window, ranked with links to each company's full record.
Top 10 Alabama Employers by OSHA Inspections (2026)
The ten Alabama employers with the most OSHA inspections on record in the current enforcement window — with violation counts, penalty totals, and links to each full inspection record.
Top 10 Alaska Employers by OSHA Inspections (2026)
The ten Alaska employers with the most OSHA inspections on record in the current enforcement window — with violation counts, penalty totals, and links to each full inspection record.
Top 10 Arizona Employers by OSHA Inspections (2026)
The ten Arizona employers with the most OSHA inspections on record in the current enforcement window — with violation counts, penalty totals, and links to each full inspection record.